DANONE
RUSSIA
Spin the wheel down or click the sign
FACILITY DETAILS:
Location:
1 Katukova str., Lipetsk
Scope of business activities:
Food production.
Enercom fixtures installation points:
Production area.
Storage facilities.
Plant perimeter
Street lighting.
Administration and living quarters.
IMPLEMENTATION PERIOD:
  1. January-March 2017
Spin the wheel down or click the sign
OBJECTIVES:

1.Turnkey modernization of the enterprise lighting system.

2.Reduction of consumption costs.

RESULT:

After the facility commissioning we managed to achieve the following indicators:

  1. Power consumption reduced by 79%
  2. Working area lighting level – 250-300 lx
  3. Release of 177 kW of electric power
  4. Light level and equipment warranty – 5 years
  5. Improved light quality for work safety, reduced blinding effect
  6. Reduced costs for purchasing the electric power and operating expenses
  7. Payback period corresponds to DANONE standards
  8. Lighting area, sq.m – 260,000
Order a consultation with our technical service manager
to find out how to save most
THEY TRUST US: