OSTANKINO
MEAT-PROCESSING PLANT
Spin the wheel down or click the sign
INFORMATION ABOUT THE OBJECT:
Location:
Moscow, Ogorodny pr., 18
Area of activity:
Food company
Enercom lights site:
Production areas, corridors, staircases, freezers, outdoor lighting
Area of the land and ceiling height:
Production facilities – 1000 m2
Corridors – 800 m2
Staircases – 300 m2
Ceiling height in production facilities – 4.5-5.6 m
Ceiling height in the administration facility – 3 m
Installation height of the lights – 4.5 – 5 m
Implementation period:

Pilot project – August, 2010

Contract conclusion – January, 2011

AIM

Lighting upgrade; replacing the old lights for LED.

Even lighting.

Meeting lighting regulations.

Spin the wheel down or click the sign
BEFORE THE UPGRADE:
  1. Luminance level – 10 % lower than the building regulations require.
  2. Ripple ratio – 15-29.
  3. Working mode – 24 hours/day.
OUTCOME:

After the commissioning we managed to achieve the following figures:

  1. Energy consumption reduced by 3.5 times.
  2. Lighting level is meeting the Dialux regulations.
  3. Ripple ratio < 5%.
  4. Office lighting meets the regulations.
  5. Light costs reduced.