FACILITY DETAILS:
The project was selected based on the lowest total cost of ownership (TCO), 3-6 producers were considered.
Location:
Novorossiysk
Scope of business activities:
The largest stevedoring operator in Russia
OBJECTIVES:

1. Compliance with lighting standards

2. Energy saving.

Spin the wheel down or click the sign
PROJECT FEATURES:

Complete replacement of the lighting system was carried out within the framework of modernization. That was a turnkey project: design, delivery of materials and equipment, installation of the new lighting system, start-up and adjustment.

When developing the lighting system, the fixture layout was changed as the current layout did not conform to the standards and the system was unsafe. The design of posts and lamps was developed specifically for the aggressive environment.

RESULT:

After the facility commissioning we managed to achieve the following indicators:

  1. Power consumption reduced by 64%
  2. The number of light points lessened twice
  3. Сompliance of light level with standard values
  4. Increased comfort of work (high uniformity of lighting and comfortable colour temperature 4000K)
  5. Lighting area, sq.m – 200,000