PAO ‘MRSK CENTER’ – ‘LIPETSKENERGO’
Spin the wheel down or click the sign
INFORMATION ABOUT THE OBJECT:
Location:
Lipetsk, u. 50 let NLMK, 13
Area of activity:
Electro-network company
Enercom lights site:
Administration facility (offices and corridors), outdoor lighting
Ceiling height:
Administration facility – 2.5-3 m
Implementation period:
August, 2011
AIM

Even lighting

Meeting lighting regulations

Energy saving

Spin the wheel down or click the sign
BEFORE THE UPGRADE:
  1. Administration facility lighting – 10 hours/day.
  2. Outdoor lighting – 11 hours/day (average annual)
OUTCOME:

After the commissioning we managed to achieve the following figures:

  1. Luminance level is now totally meeting the regulations.
  2. Ripple ratio < 1%.
  3. Energy costs reduced.
  4. No break-down in 5 years.
Order a consultation with our technical service manager
to find out how to save most