- Scope of business activities:
- Production of rolled steel
- Enercom lighting solution installation points:
- Production workshop
-To guarantee the project payback period of 3 years
-To achieve the light level exceeding the standard (200 lx) by 25-30%
-To ensure the reduction of lighting costs by at least 50%.
-To ensure maximum uniformity of the workshop lighting
-To perform works without changing the light points location
-To reduce the number of light points preserving the illumination level and uniformity of lighting
-To take into consideration the location of equipment and plants in calculations and design.
-Large open areas (170 thous. sq.m)
-Fixtures installation height - from 8 to 24 m
-Round-the-clock production process
-High ambient temperature (up to +60°C)
After the facility commissioning we managed to achieve the following indicators: