Large
Metallurgical Facility
Spin the wheel down or click the sign
FACILITY DETAILS:
Scope of business activities:
Production of rolled steel
Enercom lighting solution installation points:
Production workshop
OBJECTIVES:

-To guarantee the project payback period of 3 years

-To achieve the light level exceeding the standard (200 lx) by 25-30%

-To ensure the reduction of lighting costs by at least 50%.

-To ensure maximum uniformity of the workshop lighting

-To perform works without changing the light points location

-To reduce the number of light points preserving the illumination level and uniformity of lighting

-To take into consideration the location of equipment and plants in calculations and design.

Spin the wheel down or click the sign
PROJECT FEATURES:

-Large open areas (170 thous. sq.m)

-Fixtures installation height - from 8 to 24 m

-Round-the-clock production process

-High ambient temperature (up to +60°C)

RESULT:

After the facility commissioning we managed to achieve the following indicators:

  1. Power consumption reduced by 65%
  2. Light level increased by 93%
  3. Project payback period – 2.5 years
  4. Savings per 1,000 sq.m a year - 180,000 rubles
  5. The light level was brought in compliance with construction regulations
  6. Increased comfort of work and reduced risk of injury
  7. Lighting area, sq.m - 170,000