6 BALTICA PLANTS LIGHTING
Spin the wheel down or click the sign
INFORMATION ABOUT THE OBJECT:
Location:
Voronezh, Tula, Yaroslavl, Saint-Petersburg, Rostov, Samara
Area of activity:
Beer brewing
Enercom lights site:
Lighting system re-equipment of all plants.
Ceiling height and volume of equipment:
Installation height – 4.5 – 14 meters.
Voronezh – 1201 items
Tula – 2506 items
Yaroslavl – 2588 items
Saint-Petersburg – 5381 items
Rostov – 4379 items
Samara – 3085 items
Implementation period:

Voronezh: installation – 2.5 months, commissioning – August 2012.

Tula: installation – 2.5 months, commissioning – 2013.

Yaroslavl: installation – 2.5 months, commissioning – 2014.

Saint-Petersburg: installation – 2.5 months, commissioning – December 2014.

Rostov: installation – 3 months, commissioning – January 2015.

Samara: installation – 2.5 months, commissioning – January 2016.

AIM

Total upgrade of the lighting system; energy-saving lights installation.

Spin the wheel down or click the sign
BEFORE THE UPGRADE:
  1. Luminance level – 30 % lower than the building regulations require.
  2. Ripple ratio – 15-29.
  3. Working mode – 24 hours/day.
OUTCOME:

After the commissioning we managed to achieve the following figures:

  1. Luminance level got 30 % higher
  2. Ripple ratio < 5%
  3. Energy consumption reduced by 68 %
  4. Maintenance costs reduced
  5. 5. 24-hour light flux degradation for 3 years reached 15 %
Order a consultation with our technical service manager
to find out how to save most